NHB-07Sunset in Bow NH. With seven loads delivered this year, feeding an already HUGE HUGE stockpiled base.
This LCT arrived as NHB-07, now the ECT (Empty Coal Train) getting ready for the trip southward. The outbound power lineup is all in Norfolk Southern black which includes:
2504 (SD70) very clean
2741 (SD70M-2)
9810 (Dash 9-44CW)
2553 (SD70) very clean.
As of 9pm on 8/9, the crew had not departed Bow yet, they had one defective empty to add to the pile (5 of them now) on the Perini Siding.
Taken on Tuesday evening 8/9 from the River Road crossing in Bow.
Unknown photographer August 9, 2016.
Added to the photo archive by Jay Gadon, August 11, 2016.
Railroad: Pan Am Railways.
» Contact the person who posted this photograph.