Visitor Comments about this Photo:East Portal,HT&W yard to the left. Also, if the tunnel is now under wire, the B&M has already leased the Fitchburg RR and the engine would be B&M 182, a G class 0-6-0 switcher. Posted by Dave Wright on 2018-09-15 23:14:58 You must be logged on to post comments. |