Andover/Wilmington Double Track ProjectMBAT Rail Train dropping CWR at Wilmington Jct. Looking towards Boston you can see it taking the switch to the Wildcat Branch which connects with the Lowell line at Wilmington. Taking the main line rather than the Wildcat takes you through North Wilmington, Reading, Wakefied, Melrose and Malden on the way to Boston.This was the closest I could get and be legal hence a far away shot.This is the end of the project that starts at Andover St Lawrence, MA
Just beyond the yellow mile marker is is where the Salem and Lowell RR had a diamond. It was very near where the light colored ballast is. A switch connecting the B&M to the Salem and Lowell was on the left
Photographed by G Kenson, November 6, 2011.
Added to the photo archive by George Kenson, November 6, 2011.
Railroad: MBTA.
» Contact the person who posted this photograph.