Irish Railways Passenger TrainThe track into the trainshed is stub ended. Once the train had unloaded/loaded, it backed up to the switch, waited for it to be realigned, then continued up the grade to the left and on to Tralee. Note the semaphore signals - and all the switches/signals are mechanically controlled by the interlocking tower visible on the right.
Photographed by Andrew Davison, April 1, 2004.
Added to the photo archive by Andrew Davison, April 11, 2004.
Andrew Davison's awards: | |
» Contact the person who posted this photograph.